Василиса▶ Я жду вашего обращения. Что Вы хотите узнать?
Логотип
Decisions | Regional Technical Forum Regional Technical Forum

The RTF is a technical advisory committee to the Northwest Power and Conservation Council established in 1999 to develop standards to verify and evaluate energy efficiency savings

Header Menu nwcouncil.org Contact

Search form

primary-menu Calendar Work products UES Measures list Standard protocols list Supporting documents Propose a measure or standard protocol Proposed measures and status Whole Building Efforts Subcommittees Subcommittees Agricultural Irrigation Air Source Heat Pumps C&I Fans Subcommittee Climate Zone Subcommittee Clothes Washer and Dryer Connected Thermostats Demand Response Ductless Heat Pumps Guidelines Heat Pump Water Heaters Implementers Group Market Analysis Natural Gas Subcommittee New Homes Standard Protocol Non-Residential Lighting Operations Pump Systems Research and Evaluation Residential Behavior Residential Lighting RTF Policy Advisory Committee Secondary Glazing Systems SEEM Calibration and Measure Interaction Small and Rural Utilities Statistical Methods Whole Building Subcommittee Site menu Site menu Search Home DecisionsClose Navigation Home Calendar News & updates Decisions Guidelines About the RTF RTF Membership – 2019-2021 Work plan and budget Request for proposals Charter and bylaws Conflict of interest policy RTF Policy Advisory Committee Contacts Conservation achievements Work products UES Measures list Standard protocols list Supporting documents Propose a measure or standard protocol Proposed measures and status Whole Building Efforts Subcommittees Agricultural Irrigation Air Source Heat Pumps C&I Fans Subcommittee Climate Zone Subcommittee Clothes Washer and Dryer Connected Thermostats Demand Response Ductless Heat Pumps Guidelines Heat Pump Water Heaters Implementers Group Market Analysis Natural Gas Subcommittee New Homes Standard Protocol Non-Residential Lighting Operations Pump Systems Research and Evaluation Residential Behavior Residential Lighting RTF Policy Advisory Committee Secondary Glazing Systems SEEM Calibration and Measure Interaction Small and Rural Utilities Statistical Methods Whole Building Subcommittee nwcouncil.org Contact Close Navigation Home Toggle Siblings Home Calendar Work products Subcommittees Decisions Site menuSearch Archives About the RTF Decisions
Filter results by:Category
Clear Add filterCategory
Date Description Related Measures and Standard Protocols
December 8, 2020
Extend Sunset Date

Extend the sunset date for the Residential Connected Thermostat measure to December 2021.

Connected Thermostats
December 8, 2020
Approved Measure Updates

Approve the Residential Clothes Washers UES measure update as presented:

  • For RMC use average per configuration
  • For Hot water use average per configuration
  • Change the Category to “Proven”
  • Keep the Status at “Active”
  • Set the sunset date to December 31, 2025
Residential Clothes Washers
December 8, 2020
Approved Measure Updates

Approve the Residential Dryers UES measure update as presented:

  • Keep the Category at Proven
  • Keep the Status at Active
  • Set the sunset date to December 31, 2025
Clothes Dryers - SF, MH, and MF in-unit
December 8, 2020
Extend Sunset Date

Extend the Sunset Date for the Commercial Clothes Washers UES measure to February 2021.

Commercial Clothes Washers
November 10, 2020
Approved Measure Updates

Approve the updates to the Non-Residential Lighting Midstream UES as presented:

  • Keep the category at Proven
  • Keep the status at Active
  • Add wall packs to the measure as presented
  • Set the sunset date to November 30, 2022
Non-Residential Lighting Midstream
November 10, 2020
Approved New Measure

Approve the Commercial Boiler Systems Standard Protocol and associated Calculator as presented.

  • Set the Status to Active. 
  • Set the Sunset Date to November 30, 2025.
Commercial Boiler Systems
October 7, 2020
Approved Guidelines Updates

Adopt the proposed changes to the Guidelines as recommended by staff. RTF recommends keeping an eye on the application of the Guidelines generally, and on measure identifiers in particular, for potential future updates.

All Measure Applicable
October 6, 2020
Approved Standard Protocol Updates

Approve the updates to the New Homes Standard Protocol as presented, including:

  • Accept the component UES updates as presented
  • Continue using REM with no back-end adjustments to HVAC savings until informative evaluation results are available
  • Set the Sunset Date to January 2022
New Homes Standard Protocol
October 6, 2020
Approved Measure Updates

Approve the updates to the Advanced Rooftop Control UES measures as presented, including:

  • Incorporate Natural Gas UES estimates
  • Maintain Research Strategy
  • Keep category as Planning
  • Keep status as Active
  • Set sunset date to October 2023
Advanced Rooftop Controls
September 10, 2020
Approved Measure Update

Adopt updates to the ENERGY STAR Commercial Fryers UES measure as presented, and:

  • Set the Category to:
    • Small Saver for Electric applications
    • Planning for Natural Gas applications
  • Set the Status to Active
  • Set the Sunset Date to May 31, 2021
  • Adopt updates to the existing Research Strategy for Food Service measures. 
     
Fryers
September 10, 2020
Extend Sunset Date

Extend the sunset date for the New Homes Standard Protocol to October 2020. 

New Homes Standard Protocol
September 10, 2020
Extend Sunset Date

Extend the sunset date for the following measures to December 2020:

  • Residential Clothes Washer UES
  • Residential Clothes Dryer UES
  • Commercial Clothes Washer UES
Clothes Dryers - SF, MH, and MF in-unit , Commercial Clothes Washers , Residential Clothes Washers
September 10, 2020
Approve Recommendation of 2021 Work Plan

Adopt the proposed 2021 work plan and business plan, with recommendation to the Council for approval.

All Measure Applicable
September 10, 2020
Adopt Research Strategy

Adopt the proposed research strategy and change the ASHP Conversion and Upgrade measure status from Under Review to Active.

Air Source Heat Pump Upgrades and Conversions MH , Air Source Heat Pump Upgrades and Conversions SF
September 10, 2020
Approved Standard Protocol Update

Approve the Code Compliant Nonresidential Lighting Standard Protocol as presented:

  • Keep the Status as Active
  • Move Grocery to moderate lighting power
  • Set the Sunset Date to September 30, 2023
Non-Residential Lighting Code Compliant
September 10, 2020
Approved Measure Update

Approve updates to the Residential Lighting measure as proposed and set the Sunset Date to September 30, 2022, with the following details:

  • For screw-base lamps
    • Remove the Unsolicited Mail delivery mechanism
    • Keep the Category at Proven
    • Keep the status at Active
  • For Pin-based lamps:
    • Remove the Unsolicited Mail delivery mechanism
    • Keep the Category at Small Saver
    • Keep the status at Active
  • For Fixtures
    • Keep both the retail and direct install delivery mechanism
    • Remove the linear flush mounts
    • Keep the Category at Proven
    • Keep the status at Active
Residential Lighting
August 18, 2020
Allocated Resources

Allocate resources to developing the following measures:

  • Extended capacity heat pumps
  • Residential cellular shades
  • Commercial Tier 2 Electric Vehicle Chargers

Do not allocate resources to developing the following measures:

  • Thin insulation coatings
Air Source Heat Pump Upgrades and Conversions MH , Air Source Heat Pump Upgrades and Conversions SF , Commercial Tier 2 Electric Vehicle Chargers , Residential Cellular Shades , Thin insulation coating energy savings
August 18, 2020
Approved New Measure

Adopt the ENERGY STAR Refrigerated Beverage Vending Machine measure as presented, and:

  • Set the Category to Small Saver
  • Set the Status to Active
  • Set the Sunset Date to August 31, 2025
  • Calculate incremental costs as a weighted average of costs for CO2 (25%) and Propane (75%) coolants.
ENERGY STAR Refrigerated Beverage Vending Machines
July 22, 2020
Approved Measure Updates

Approve updates to the School Weatherization UES as presented:

  • Update the distribution efficiencies:
    • Gas furnace to 80%
    • Gas boiler to 90%
    • ASHP to 70%
    • Electric furnace to 80%
    • WSHP to 70%, and
  • Keep the Category at Small Saver
  • Keep the Status at Active
  • Set the sunset date to July 2025 
School Weatherization
July 22, 2020
Approved Measure Updates

Updated the Voltage Optimization Standard Protocol as presented:

  • Keep the Status at Active
  • Set the Sunset Date to July 2025
Voltage Optimization Protocol
July 22, 2020
Suspended Measure Development

Do not pursue the development of a measure for lodging guest room controls at this time.

Lodging Guest Room Controls
July 22, 2020
Approved Research Strategy

Approved the updates to the Low-Rise Multifamily Weatherization Research Strategy as presented. 

Multi-Family Weatherization
July 21, 2020
Approved New Measure

Approved the Variable Speed Drive UES measure analysis and Research Strategy as presented. Set the Category to Planning, the status to Under Review, and the Sunset Date to July 31, 2021.

Variable Speed Drives
July 21, 2020
Approved Measure Updates

Kept the Engine Block Heater Controls Planning UES measure as-is, extended the sunset date to July 31, 2023, and adjusted HZ1 plug in schedule to December through February.

Engine Block Heater Controls
July 21, 2020
Extend Sunset Dates

Extend the sunset date for the Residential Clothes Dryers UES to September 2020. 

Clothes Dryers - SF, MH, and MF in-unit
June 24, 2020
Approved Measure Changes

Approve the updates to the Multifamily Low-Rise Weatherization UES Measures as presented, and 

  • Keep/Set the Categories at Planning for Zonal Electric and Gas and Small Saver for all others 
  • Review and confirm the research strategy (especially on sample size), report back to RTF
  • Provide only the "Any AFUE" measure, set at 80 AFUE
  • Keep the Status as Active
  • Set the Sunset Date to June 2023.
Multi-Family Weatherization
June 24, 2020
Approved Measure Changes

The Anti-Sweat Heater Controls UES be approved as presented and change the Category to Small Saver, Change the Status to Active, Change the sunset date to June 30, 2025.

Anti-Sweat Heater Controls
June 24, 2020
Approved New Measure

Adopt  the Commercial ENERGY STAR Ice Maker UES measure as presented and set the Category to Small Saver, Set the Status to Active, Set the Sunset date to June 30, 2025.

ENERGY STAR Ice Makers
June 24, 2020
Approved New Measure

Adopt the new Planning UES measure Forced Circulation Engine Block Heaters for Non-Residential Standby Generators as Presented. Use restaurant heating load shape, set the measure category to Planning, set the measure status to Active, and set the sunset date to June 30, 2023.

Forced Circulation Generator Engine Block Heaters for Nonresidential Standby Generators
June 23, 2020
Approved Measure Changes

Approve updates to Circulator Pumps UES measure as presented. Keep the Category at Planning, Keep the Status at Active, Set the sunset date to June 30, 2023.

Circulator Pumps
June 23, 2020
Deactivate Measure

Deactivate the Residential and Commercial Showerheads UES measures.

Commercial and Residential Showerheads
June 23, 2020
Approved Measure Changes

Approve the updates to the Thermostatic Shower Restriction Valve UES measure as proposed and keep the Category at Planning, keep the Status at Active, and set the sunset date to June 30, 2023.

Thermostatic Shower Restriction Valve
June 23, 2020
Deactivate Measure

Deactivate the Multifamily New Construction (ID and MT) UES measure. 

Multifamily New Construction (ID and MT)
June 23, 2020
Extend Sunset Dates

Extend the sunset dates for the New Homes Standard Protocol and School Weatherization UES measures to September 2020.

School Weatherization , New Homes Standard Protocol
May 19, 2020
Approved Measure Changes

 Adopt the updates to the Residential Single Family and Manufactured Homes Weatherization UES Measures as presented and:

  • Add Gas Furnace measure identifiers
  • Adjust assumed AFUEs based on data collected in both RBSAI and RBSAII 
  • For the Gas Furnace measure identifiers, set the Categories to
    • Proven for all SF measure applications, except Windows
    • Planning for all SF Window measure applications
    • Small Saver for all MH measure applications
  • Change the Statuses to Active
  • Adopt the Research Strategy as presented
  • Leave the Sunset Dates unchanged.
Manufactured Home Weatherization , Single Family Weatherization
May 19, 2020
Approved Measure Changes

Accept the updates to the New Manufactured Home and HVAC UES measures as proposed, and specifically:

  • Keep the Category Planning
  • Set the Status to Active
  • Set the sunset date to May 2023
  • Set the fraction of heat pumps to 40%
  • Zero-out the supplemental NEI's
New Manufactured Homes and HVAC
May 19, 2020
Approved Research Strategy
  • Accept the proposed research strategy for commercial and industrial fans
  • Change the measure status from Under Review to Active.
Commercial & Industrial Fans
April 21, 2020
Extend Sunset Date

Extend the sunset date for the New Manufactured Homes and HVAC UES measure to July 2020. 

New Manufactured Homes and HVAC
April 21, 2020
Approved Measure Changes

Approve updates to the Efficient Pumps USE measure as presented, including: keep ER metric in the measure identifiers, keep eligibility at 200 HP motors and less, direct CAT to update savings shapes to reflect shapes observed in research, keep the status as Active, Change the Category to Proven, set the sunset date to April 30, 2023.

Efficient Pumps
April 21, 2020
Adopt New Measure

Approve the Consumer HPWH in Commercial Applications UES measure as proposed, add Groceries into the the high use category, change measure life to ASHP measure, set the Category to Planning, adopt the Research Strategy as outlined. Set the status to Active. Set the sunset date to January 2021.

Consumer Heat Pump Water Heater in Commercial Applications
April 21, 2020
Approved Research Strategy

Adopt the Research Strategy for the High Efficiency Residential Central Air Conditioner UES measures as presented and set the Measure Status to Active.

High Efficiency Residential Central Air Conditioners
March 24, 2020
Approve SEEM Calibration

Approve the single-family and manufactured home SEEM calibrations for natural gas with these modifications:

  • Zero out 'electric heat' MH Phase II adjustment
March 24, 2020
Approve ProCost Updates

Approve the changes to ProCost template and methodology for estimating gas inputs as presented.

March 24, 2020
Extend Sunset Date

Extend the sunset date for the ENERGY STAR Commercial Refrigerators and Freezers measure to March 31, 2025.

Commercial Refrigerators/Freezers
March 24, 2020
Extend Sunset Date

Extend the sunset date of the Circulator Pumps UES measure to July 2020.

Circulator Pumps
February 19, 2020
Extend Sunset Date

Extend the sunset date for the following measures to June 30, 2020: 

  • Commercial and Residential Showerheads
  • Thermostatic Shower Restriction Valves
Commercial and Residential Showerheads , Thermostatic Shower Restriction Valve
January 22, 2020
Adopt New Measure

Adopt the High Efficiency Residential Central Air Conditioners Measure: 

  • Set the Category to Planning
  • Set the Status to Under Review
  • Set the Sunset Date to January 31, 2023
  • Add EER minimum thresholds in the measure identifiers consistent with the CEE specifications, using EER 13.0 for the SEER 17.0 identifier. 
High Efficiency Residential Central Air Conditioners
January 22, 2020
Deactivate Measure

Deactivate the SF and MH Commissioning, Controls and Sizing UES measure and consider any future new measure proposal from utility stakeholders. 

Commissioning, Controls, & Sizing MH , Commissioning, Controls, & Sizing SF
January 22, 2020
Approved Measure Changes

Approve the Commercial and Industrial Fans UES measure savings, costs, and lifetime as presented:

  • Set the Category to Planning
  • Set the Status to Under Review
  • Set the Sunset Date to January 31, 2023
  • Direct staff to work with subject matter experts and the Research and Evaluation Subcommittee to refine the Research Strategy 
Commercial & Industrial Fans
November 19, 2019
Approved Measure Changes

Approve the updates to the Non-residential Lighting Midstream UES as Presented:

  • For T8 Replacement TLED share assume:
    • Option 2: 26% based on NEEA analysis only
  • Keep the Category as "Proven"
  • Keep the status at "Active"
  • Set the sunset date to November 30, 2020
Non-Residential Lighting Midstream
November 19, 2019
Approved Measure Changes

Approve updates to the Anti-Sweat Heater Controls UES as presented and:

  • Change the Category to Proven
  • Change the Status at Under Review
  • Set the sunset date to October 31, 2022
Anti-Sweat Heater Controls
November 19, 2019
Extend Sunset Date

Extend the sunset date for the Residential Connected Thermostats UES measure to December 31, 2020

Connected Thermostats
November 19, 2019
Extend Sunset Date

Extend the sunset date for the following measures to January 31, 2020:

  • Air Source Heat Pump Upgrades SF
  • Air Source Heat Pump Upgrades and Controls MH
  • Commissioning, Controls and Sizing MH
  • Commissioning, Controls and Sizing SF
Air Source Heat Pump Upgrades and Conversions MH , Air Source Heat Pump Upgrades and Conversions SF , Commissioning, Controls, & Sizing MH , Commissioning, Controls, & Sizing SF
November 19, 2019
Approved Measure Changes

Approve the updates to the Residential Manufactured Homes Weatherization Measure as presented and:

  • Set Category to Planning
  • Set Status to Under Review
  • Set the Sunset date to November 30, 2022
  • Review, and if needed update ASHP sizing assumptions base on BPA CC&S dataset and any additional data to inform heat pump sizing for ASHP measure
  • Adjust the measure life for infiltration to 25 years
  • Adjust the Phase 1 Calibration factor for this measure from 0.5 to 0.6
  • During the QA/QC process, add a 10% infiltration reduction to window upgrade and retrofit measure application in the SF Weatherization analysis
Manufactured Home Weatherization
November 19, 2019
Allocate Resources to New Measure Development

Allocate resources to: 

  • Small Commercial DHPs 
  • Generator Engine Block Heaters
  • ENERGY STAR Air Purifiers
  • Non-Residential LED Wallpacks
  • Residential High Efficiency Central AC
  • Advanced Kitchen Ventilation Controls 
  • Retrofit or Upgrade Doors on Existing Display Cases 
  • Air Curtains for Walk-Ins
  • Floating Controls for Multiplex Refrigeration System
  • Display Case Upgrade and Replacement

Do not allocate resource to:

  • Workstation Power Management Devices
  • Anti-Fouling Refrigerant Additives 
  • ENERGY STAR Dehumidifiers

 

Advanced Kitchen Ventilation Controls , Air Curtains for Walk-Ins , Display Case Upgrade and Replacement , ENERGY STAR Air Purifiers , Floating Controls for Multiplex Refrigeration System , Forced Circulation Generator Engine Block Heaters for Nonresidential Standby Generators , , High Efficiency Residential Central Air Conditioners , NanoX Technologies Cold-Plus Energy Efficient Technology , Non-Residential LED Wallpacks , Non-Residential Lighting Midstream , Retrofit or Upgrade Doors on Existing Display Cases , Small Commercial DHPs
October 22, 2019
Approved Measure Changes

Adopt the updates to the Residential SF Weatherization Measures as presented and:

  • Set the Category to Planning 
  • Set the Status to Under Review
  • Set the Sunset Date to Oct. 31, 2022
  • Review, and if needed update, ASHP sizing assumptions based on BPA CC&S data set
Single Family Weatherization
October 22, 2019
Approved Measure Changes

Adopt the Refrigerator/Freezer Decommissioning and Recycling Measure as presented:

  • Keep the Category at Proven
  • Keep the Status at Active 
  • Set the sunset  date to September 30, 2022
Refrigerator/Freezer Decommissioning
October 22, 2019
Approved Measure Changes

Adopt the updates as presented to the DHPs for Zonal Heat SF and MH measure

  • Set the Category to Proven for SF and Small Saver for MH
  • Set the measure status to Active 
  • Set the sunset date to October 31, 2024
  • Direct staff to explore: 
    • screen with a combined VBDD R2 + temperature sensitive consumption, and
    • screen with supplemental fuels only

          and present to the RTF at a later date. 

Ductless Heat Pumps for Zonal Heat MH , Ductless Heat Pumps for Zonal Heat SF
September 24, 2019
Approved Measure Changes

Approve the updates to the Residential Lighting UES measure as proposed with the application of the 45 lumen/watt standard for general purpose lamps in all states and for the expanded definition of GSLs (DOE Jan. 2017) for WA state, effective January 1, 2020. 

  • For Screw-base lamps: keep Category at Proven, Status at Active, and set the sunset date to 9/30/20
  • For Pin-base lamps: keep Category at Small Saver, Status at Active, and set the sunset date to 9/30/20
  • For Fixtures: keep the Category at Planning, Status at Active, and set the sunset date to 9/30/20
Residential Lighting
September 24, 2019
Extend Sunset Date

Extend the sunset date for the following measures to December 2019:

  • Commercial Grocery Anti-sweat Heater Controls UES
  • Residential Refrigerator/Freezer Decomissioning UES
Anti-Sweat Heater Controls , Refrigerator/Freezer Decommissioning
September 24, 2019
Approve Work/Business Plan and Charter Update

Adopt the proposed 2020 work plan and business plan, with recommendation to the Council for approval.

Approve updates to the RTF Charter, as presented, with recommendation to the Council for approval. 

September 24, 2019
Approve SEEM Calibration Results

Approve the 'simplest-case' Phase I regression, as described in slide 58:

  • Use a single slope coefficient based on SEEM.EUI, a separate constant for each heating system, and no other variables.

Approve Phase II of the calibration, as presented. 

August 27, 2019
Approve SEEM Calibration

Approve the single family phase II calibration as described above.

August 27, 2019
Extend Sunset Date

Extend the sunset date for the Multifamily New Construction (ID and MT) UES to June 2020. 

Multifamily New Construction (ID and MT)
August 27, 2019
Extend Sunset Date

Extend the sunset date for the Potato/Onion Shed Fan Variable Frequency Drive to August 2024 and:

  • Keep the Category Small Saver
  • Keep the Status Active
  • RTF will explore available data from recent projects to see if there might be an enhancement to the existing analysis.
Potato/Onion Shed Variable Frequency Drives
July 23, 2019
Approve SEEM Calibration

Approve the single-family phase 1 calibration (v. 2.2) as presented, and direct staff to conduct a check on the electric calibration using consumption and other best available data and report back with findings. 

July 23, 2019
Approved Measure Changes

Approve the Floating Head Pressure Controls UES as presented

  • Update load shape to floating head pressure control
  • Add cost for variable speed fan 
  • Keep the Category at Small Saver
  • Keep the Status at Active
  • Set the sunset date to July 30, 2024
Floating Head Pressure Controls for Single Compressor Systems
July 23, 2019
Approved Measure Changes

Approve the Strip Curtain UES as presented and change the sunset date to July 30, 2024.

Strip Curtains
June 18, 2019
Approve Demand Response Impact Estimate

Approve the recommended methodology for estimating maximum per unit potential of Residential Water Heaters as presented. 

  • The RTF recognized the additional factors will need to be considered to estimate achievable potential, which will be dependent on the DR product.
  • The RTF recommends that staff incorporate any relevant findings from the PNNL analysis into its material and update the RTF on notable findings.
June 18, 2019
Approve Demand Response Impact Estimate

Approve the  recommended methodology for estimating maximum technical per unit potential of Refrigerated Warehouses as presented. 

  • In approving this the RTF recognizes that additional factors will need to be considered to estimate achievable potential, including the considerations listed in the presentation. 
June 18, 2019
Deactivate Measure

Deactivate the Door Gasket Replacement UES.

Door Gasket Replacement
June 18, 2019
Extend Sunset Dates

Extend the sunset date for the Floating Head Pressure Controls UES to September 2019
Extend the sunset date for the following measures to November 2019:

  • ASPH upgrades SF
  • CC&S SF
  • ASHP Upgrades and Conversions MH
  • CC&S MH
  •  MH Weatherization (Heat Pumps)
  • DHP in Zonal Electric Resistance Homes SF
  • DHP in Zonal Electric Resistance Homes MH
  • SF Weatherization 

 

Air Source Heat Pump Upgrades and Conversions MH , Air Source Heat Pump Upgrades and Conversions SF , Commissioning, Controls, & Sizing MH , Commissioning, Controls, & Sizing SF , Ductless Heat Pumps for Zonal Heat MH , Ductless Heat Pumps for Zonal Heat SF , Floating Head Pressure Controls for Single Compressor Systems , , Single Family Weatherization
May 21, 2019
Approve Demand Response Impact Estimate

Approve the recommended methodology for estimating maximum technical per unit potential of Irrigation Pumps as presented. In approving this, the RTF recognizes that additional factors will need to be considered to estimate achievable potential, including, but are not limited to:

  • the portion of systems automatically dispatched verses manually controlled
  • the coincidence between crop water usage patterns and peak loads
  • the relationship between event length and duration and participation rates.
May 21, 2019
Endorse White Paper Findings and Recommendations

The RTF endorses the findings and recommendations provided in the executive summary of the whole building white paper, and directs that the RTF staff engages in further activities as presented.

May 21, 2019
Adopt New Measure

Adopt Residential Level 2 AC EV Chargers: 

  • Adopt the savings, costs, EUL, and measure load shape as presented
  • Set the sunset date to May, 2021
  • Set the category to Small Saver
  • Set the status to Active.
Level 2 Electric Vehicle Charger
April 23, 2019
Deactivate Measure

Deactivate Slab Insulation UES.

Slab Insulation
April 23, 2019
Extend Sunset Date

Extend the sunset date for the Potato/Onion Shed VFD UES to August 2019. 

Potato/Onion Shed Variable Frequency Drives
April 23, 2019
Approve Measure Updates

Adopt the updates to the Residential Electronic Thermostats measure as presented:

  • Keep the Status as Active
  • Keep the Category at Planning
  • Change the assumed number of retrofitted thermostats per home to 5 for SF and 3 for MF
  • Assume that DHP/Hybrid applications have one fewer thermostat per home retrofitted
  • Use both RBSA I and RBSA II by heating zone and heating system type in calculating heating consumption
  • Change the Measure Name to 'Residential Electronic Line Voltage Thermostats'
  • Set the Sunset Date to April 30, 2022. 
Residential Electronic Line Voltage Thermostats
April 23, 2019
Approve Measure Updates

Approve the updates to the Compressor Head Fan Motor Retrofit ECM UES measure as presented and:

  • Keep the Category at Small Saver
  • Keep the Status at Active
  • Set the Sunset date to May 31, 2021
Compressor Head Fan Motor Retrofit to ECM
April 23, 2019
Approve Measure Updates

Approve the updates to the Display Case Evaporator Fan Motor Retrofit to ECM UES measure as presented and:

  • Change the measure name to “Display Case Evaporator Fan Motor Retrofit”
  • Keep the Category at Small Saver
  • Keep the Status at Active
  • Set the Sunset Date to May 31, 2021
Display Case Evaporator Fan Motor Retrofit
March 19, 2019
Extend Sunset Dates

Extend the sunset date for the following measures as follows:

  • Compressor Head Fan Motor Retrofit to ECM UES to July 2019
  • ECMs for Display Cases to July 2019
  • Multifamily Weatherization to December 2019
  • School Weatherization to December 2019
Compressor Head Fan Motor Retrofit to ECM , Display Case Evaporator Fan Motor Retrofit , Multi-Family Weatherization , School Weatherization
March 19, 2019
Adopt Standard Information Workbook Updates

Adopt the updates to the Standard Information Workbook as presented with the following modifications:

  • Update market rate modifier from 1.5 to 2.0 for skilled labor rates;
  • Except the air source heat pump costs.
All Measure Applicable
February 20, 2019
Approve Measure Updates

Approve the updates as presented to the Residential and Low Flow Showerhead measure.

  • Change the measure identifier from 1.75 to 1.8 gpm or less and update the savings to the extent that they are affected
  • Use 0.9 in situ adjustment factor
  • Update duration with 2016 Residential End Use Water Survey
  • Add embedded water energy savings to TRC
  • Use updated web-scraping data for current practice
  • Keep the category at Planning
  • Keep the status at Active
  • Set the sunset data to February 28, 2020 to check on progress of research
Commercial and Residential Showerheads
February 20, 2019
Approve Measure Updates

Approve the updates as presented to the Commercial Low Flow Showerhead measure.

  • Change the measure identifier from 1.75 to 1.8 gpm or less and update the savings to the extent that they are affected
  • In-situ flow adjustment of 0.9
  • Change retail delivery mechanism to wholesale
  • Add embedded water energy savings to TRC
  • Keep the category at Small Saver
  • Keep the status at active
  • Set the sunset date to February 28, 2020
Commercial and Residential Showerheads
February 20, 2019
Approve Measure Updates

Approve the updates as presented to the Thermostatic Shower Restrictor Valve measure:

  • Make changes consistent with residential low flow showerheads as approved
  • Add embedded water energy to TRC
  • Keep the category at Planning
  • Keep the status at Active
  • Set the sunset date to February 28, 2020
Thermostatic Shower Restriction Valve
February 20, 2019
Approve Demand Response Savings Estimate

Approve the per unit demand response savings estimates for Networked Residential Level 2 AC EV Chargers as presented.

Level 2 Electric Vehicle Charger
February 20, 2019
Approve Demand Response Savings Estimate

Approve the analysis of demand response savings (as a percentage of lighting load) and cost for Non-residential Lighting Controls as presented and including updated controls costs from NEEA.

January 23, 2019
Extend Sunset Date

Extend the sunset date for the Ductless Heat Pumps for Zonal Heat Single Family and Manufactured Homes measures to June 2019, and set the measure status to Under Review. 

Ductless Heat Pumps for Zonal Heat MH , Ductless Heat Pumps for Zonal Heat SF
January 23, 2019
Approve Measure Updates

Adopt the updates to the Refrigerator and Freezer UES as presented and:

  •  Set the Category to Proven
  •  Set the Status to Active
  •  Set the sunset date to January 2024
  •  Where we don't have ESME sales data, set the UEC to 15% less than the sales-weighted Federal Standard.
Residential Refrigerators and Freezers
January 23, 2019
Extend Sunset Date

Extend the sunset date for the following measures to July 2019:

  • Manufactured Home ASHP Upgrades
  • Manufactured Home  ASHP Conversions
  • Manufactured Home Weatherization (Heat pumps)
  • Manufactured Home Commissioning Controls and Sizing
Air Source Heat Pump Upgrades and Conversions MH , Commissioning, Controls, & Sizing MH ,
January 23, 2019
Approve Measure Updates

Approve the updates to the Nonresidential Lighting Retrofits Standard Protocol as presented and in the Additional Slides section.

  • Update the methodology for determining the current practice watts to an average of the pre-condition implied watts and the efficient case implied watts
  • Set the sunset date to January 2021
Non-Residential Lighting Retrofits
January 23, 2019
Approve Methodology Changes

Approve the methodology for mapping locations to available weather data and for selecting weather locations for building simulation in measure assessments. 

November 8, 2018
Extend Measure Sunset Dates

Extend the sunset date for the Residential Air Source Heat Pump Upgrades SF UES and Commissioning Controls and Sizing in SF UES to June 30, 2019.

Air Source Heat Pump Upgrades and Conversions SF , Commissioning, Controls, & Sizing SF
November 8, 2018
Adopt New Measure

Adopt the Commercial Glazing Systems UES measure as proposed:

  • set the Category to Planning;
  • set the Status to Active; and 
  • set the Sunset Date at November 30, 2021
Commercial Secondary Glazing Systems
November 7, 2018
Approve Measure Updates

Approve the updates to the Residential Advanced Power Strips UES measure savings, costs, lifetime, and Research Strategy as presented and:

  •  Keep the Category at Planning
  • Keep the Status at Active
  • Set the sunset date to November 30, 2021
Residential Advanced Power Strips
November 7, 2018
Approve Measure Updates

Approve the updates to the Commercial Advanced Power Strips UES measure savings, costs, lifetime, and Research Strategy as presented and:

  •  Keep the Category at Planning
  • Keep the Status at Active
  • Set the sunset date to November 30, 2021
  • Look at other savings shapes and revise to make consistent with the Plan for this measure and report back to the RTF
Commercial Advanced Power Strips
November 7, 2018
Approve Measure Updates

Approve the updates to the Non-Residential Lighting Midstream UES measures as presented 

  • Keep the Category at Proven
  • Keep the Status at Active
  • Set the sunset date to November 30,2019
Non-Residential Lighting Midstream
November 7, 2018
Approve Measure Updates

Approve the analysis updates for the Residential Lighting UES measure as presented:
For Screw-base Lamps: 

  • Keep the Category at Proven
  • Keep the Status at Active
  • Remove top two lumen bins for Globe lamps

For Pin-Base Lamps:

  • Keep the Category at Small Saver
  • Keep the Status at Active

For Fixtures:

  • Keep the Category at Planning
  • Keep the Status at Active
  • Maintain the existing Research Strategy
  • Remove LDL from specification

For all applications:

  • Set the sunset date to December 31, 2019 to update sales and baseline data
Residential Lighting
November 7, 2018
Allocate Resources to New Measure Development

Allocate resources to developing the Level 2 Electric Vehicle Charger UES.

Level 2 Electric Vehicle Charger
Pages1 2 3 4 5 6 7 next › last » Archives ELCAP Conservation achievements An advisory committee of: Northwest Power & Conservation Council ©2021 Regional Technical Forum. All Rights Reserved. randomness
© 2014-2021 ЯВИКС - все права защищены.
Наши контакты