The RTF is a technical advisory committee to the Northwest Power and Conservation Council established in 1999 to develop standards to verify and evaluate energy efficiency savings
Header Menu nwcouncil.org Contact primary-menu Calendar Work products UES Measures list Standard protocols list Supporting documents Propose a measure or standard protocol Proposed measures and status Whole Building Efforts Subcommittees Subcommittees Agricultural Irrigation Air Source Heat Pumps C&I Fans Subcommittee Climate Zone Subcommittee Clothes Washer and Dryer Connected Thermostats Demand Response Ductless Heat Pumps Guidelines Heat Pump Water Heaters Implementers Group Market Analysis Natural Gas Subcommittee New Homes Standard Protocol Non-Residential Lighting Operations Pump Systems Research and Evaluation Residential Behavior Residential Lighting RTF Policy Advisory Committee Secondary Glazing Systems SEEM Calibration and Measure Interaction Small and Rural Utilities Statistical Methods Whole Building Subcommittee Site menu Site menu Search
Date | Description | Related Measures and Standard Protocols |
---|---|---|
December 8, 2020 |
Extend Sunset Date
Extend the sunset date for the Residential Connected Thermostat measure to December 2021. |
Connected Thermostats |
December 8, 2020 |
Approved Measure Updates
Approve the Residential Clothes Washers UES measure update as presented:
|
Residential Clothes Washers |
December 8, 2020 |
Approved Measure Updates
Approve the Residential Dryers UES measure update as presented:
|
Clothes Dryers - SF, MH, and MF in-unit |
December 8, 2020 |
Extend Sunset Date
Extend the Sunset Date for the Commercial Clothes Washers UES measure to February 2021. |
Commercial Clothes Washers |
November 10, 2020 |
Approved Measure Updates
Approve the updates to the Non-Residential Lighting Midstream UES as presented:
|
Non-Residential Lighting Midstream |
November 10, 2020 |
Approved New Measure
Approve the Commercial Boiler Systems Standard Protocol and associated Calculator as presented.
|
Commercial Boiler Systems |
October 7, 2020 |
Approved Guidelines Updates
Adopt the proposed changes to the Guidelines as recommended by staff. RTF recommends keeping an eye on the application of the Guidelines generally, and on measure identifiers in particular, for potential future updates. |
All Measure Applicable |
October 6, 2020 |
Approved Standard Protocol Updates
Approve the updates to the New Homes Standard Protocol as presented, including:
|
New Homes Standard Protocol |
October 6, 2020 |
Approved Measure Updates
Approve the updates to the Advanced Rooftop Control UES measures as presented, including:
|
Advanced Rooftop Controls |
September 10, 2020 |
Approved Measure Update
Adopt updates to the ENERGY STAR Commercial Fryers UES measure as presented, and:
|
Fryers |
September 10, 2020 |
Extend Sunset Date
Extend the sunset date for the New Homes Standard Protocol to October 2020. |
New Homes Standard Protocol |
September 10, 2020 |
Extend Sunset Date
Extend the sunset date for the following measures to December 2020:
|
Clothes Dryers - SF, MH, and MF in-unit , Commercial Clothes Washers , Residential Clothes Washers |
September 10, 2020 |
Approve Recommendation of 2021 Work Plan
Adopt the proposed 2021 work plan and business plan, with recommendation to the Council for approval. |
All Measure Applicable |
September 10, 2020 |
Adopt Research Strategy
Adopt the proposed research strategy and change the ASHP Conversion and Upgrade measure status from Under Review to Active. |
Air Source Heat Pump Upgrades and Conversions MH , Air Source Heat Pump Upgrades and Conversions SF |
September 10, 2020 |
Approved Standard Protocol Update
Approve the Code Compliant Nonresidential Lighting Standard Protocol as presented:
|
Non-Residential Lighting Code Compliant |
September 10, 2020 |
Approved Measure Update
Approve updates to the Residential Lighting measure as proposed and set the Sunset Date to September 30, 2022, with the following details:
|
Residential Lighting |
August 18, 2020 |
Allocated Resources
Allocate resources to developing the following measures:
Do not allocate resources to developing the following measures:
|
Air Source Heat Pump Upgrades and Conversions MH , Air Source Heat Pump Upgrades and Conversions SF , Commercial Tier 2 Electric Vehicle Chargers , Residential Cellular Shades , Thin insulation coating energy savings |
August 18, 2020 |
Approved New Measure
Adopt the ENERGY STAR Refrigerated Beverage Vending Machine measure as presented, and:
|
ENERGY STAR Refrigerated Beverage Vending Machines |
July 22, 2020 |
Approved Measure Updates
Approve updates to the School Weatherization UES as presented:
|
School Weatherization |
July 22, 2020 |
Approved Measure Updates
Updated the Voltage Optimization Standard Protocol as presented:
|
Voltage Optimization Protocol |
July 22, 2020 |
Suspended Measure Development
Do not pursue the development of a measure for lodging guest room controls at this time. |
Lodging Guest Room Controls |
July 22, 2020 |
Approved Research Strategy
Approved the updates to the Low-Rise Multifamily Weatherization Research Strategy as presented. |
Multi-Family Weatherization |
July 21, 2020 |
Approved New Measure
Approved the Variable Speed Drive UES measure analysis and Research Strategy as presented. Set the Category to Planning, the status to Under Review, and the Sunset Date to July 31, 2021. |
Variable Speed Drives |
July 21, 2020 |
Approved Measure Updates
Kept the Engine Block Heater Controls Planning UES measure as-is, extended the sunset date to July 31, 2023, and adjusted HZ1 plug in schedule to December through February. |
Engine Block Heater Controls |
July 21, 2020 |
Extend Sunset Dates
Extend the sunset date for the Residential Clothes Dryers UES to September 2020. |
Clothes Dryers - SF, MH, and MF in-unit |
June 24, 2020 |
Approved Measure Changes
Approve the updates to the Multifamily Low-Rise Weatherization UES Measures as presented, and
|
Multi-Family Weatherization |
June 24, 2020 |
Approved Measure Changes
The Anti-Sweat Heater Controls UES be approved as presented and change the Category to Small Saver, Change the Status to Active, Change the sunset date to June 30, 2025. |
Anti-Sweat Heater Controls |
June 24, 2020 |
Approved New Measure
Adopt the Commercial ENERGY STAR Ice Maker UES measure as presented and set the Category to Small Saver, Set the Status to Active, Set the Sunset date to June 30, 2025. |
ENERGY STAR Ice Makers |
June 24, 2020 |
Approved New Measure
Adopt the new Planning UES measure Forced Circulation Engine Block Heaters for Non-Residential Standby Generators as Presented. Use restaurant heating load shape, set the measure category to Planning, set the measure status to Active, and set the sunset date to June 30, 2023. |
Forced Circulation Generator Engine Block Heaters for Nonresidential Standby Generators |
June 23, 2020 |
Approved Measure Changes
Approve updates to Circulator Pumps UES measure as presented. Keep the Category at Planning, Keep the Status at Active, Set the sunset date to June 30, 2023. |
Circulator Pumps |
June 23, 2020 |
Deactivate Measure
Deactivate the Residential and Commercial Showerheads UES measures. |
Commercial and Residential Showerheads |
June 23, 2020 |
Approved Measure Changes
Approve the updates to the Thermostatic Shower Restriction Valve UES measure as proposed and keep the Category at Planning, keep the Status at Active, and set the sunset date to June 30, 2023. |
Thermostatic Shower Restriction Valve |
June 23, 2020 |
Deactivate Measure
Deactivate the Multifamily New Construction (ID and MT) UES measure. |
Multifamily New Construction (ID and MT) |
June 23, 2020 |
Extend Sunset Dates
Extend the sunset dates for the New Homes Standard Protocol and School Weatherization UES measures to September 2020. |
School Weatherization , New Homes Standard Protocol |
May 19, 2020 |
Approved Measure Changes
Adopt the updates to the Residential Single Family and Manufactured Homes Weatherization UES Measures as presented and:
|
Manufactured Home Weatherization , Single Family Weatherization |
May 19, 2020 |
Approved Measure Changes
Accept the updates to the New Manufactured Home and HVAC UES measures as proposed, and specifically:
|
New Manufactured Homes and HVAC |
May 19, 2020 |
Approved Research Strategy
|
Commercial & Industrial Fans |
April 21, 2020 |
Extend Sunset Date
Extend the sunset date for the New Manufactured Homes and HVAC UES measure to July 2020. |
New Manufactured Homes and HVAC |
April 21, 2020 |
Approved Measure Changes
Approve updates to the Efficient Pumps USE measure as presented, including: keep ER metric in the measure identifiers, keep eligibility at 200 HP motors and less, direct CAT to update savings shapes to reflect shapes observed in research, keep the status as Active, Change the Category to Proven, set the sunset date to April 30, 2023. |
Efficient Pumps |
April 21, 2020 |
Adopt New Measure
Approve the Consumer HPWH in Commercial Applications UES measure as proposed, add Groceries into the the high use category, change measure life to ASHP measure, set the Category to Planning, adopt the Research Strategy as outlined. Set the status to Active. Set the sunset date to January 2021. |
Consumer Heat Pump Water Heater in Commercial Applications |
April 21, 2020 |
Approved Research Strategy
Adopt the Research Strategy for the High Efficiency Residential Central Air Conditioner UES measures as presented and set the Measure Status to Active. |
High Efficiency Residential Central Air Conditioners |
March 24, 2020 |
Approve SEEM Calibration
Approve the single-family and manufactured home SEEM calibrations for natural gas with these modifications:
|
|
March 24, 2020 |
Approve ProCost Updates
Approve the changes to ProCost template and methodology for estimating gas inputs as presented. |
|
March 24, 2020 |
Extend Sunset Date
Extend the sunset date for the ENERGY STAR Commercial Refrigerators and Freezers measure to March 31, 2025. |
Commercial Refrigerators/Freezers |
March 24, 2020 |
Extend Sunset Date
Extend the sunset date of the Circulator Pumps UES measure to July 2020. |
Circulator Pumps |
February 19, 2020 |
Extend Sunset Date
Extend the sunset date for the following measures to June 30, 2020:
|
Commercial and Residential Showerheads , Thermostatic Shower Restriction Valve |
January 22, 2020 |
Adopt New Measure
Adopt the High Efficiency Residential Central Air Conditioners Measure:
|
High Efficiency Residential Central Air Conditioners |
January 22, 2020 |
Deactivate Measure
Deactivate the SF and MH Commissioning, Controls and Sizing UES measure and consider any future new measure proposal from utility stakeholders. |
Commissioning, Controls, & Sizing MH , Commissioning, Controls, & Sizing SF |
January 22, 2020 |
Approved Measure Changes
Approve the Commercial and Industrial Fans UES measure savings, costs, and lifetime as presented:
|
Commercial & Industrial Fans |
November 19, 2019 |
Approved Measure Changes
Approve the updates to the Non-residential Lighting Midstream UES as Presented:
|
Non-Residential Lighting Midstream |
November 19, 2019 |
Approved Measure Changes
Approve updates to the Anti-Sweat Heater Controls UES as presented and:
|
Anti-Sweat Heater Controls |
November 19, 2019 |
Extend Sunset Date
Extend the sunset date for the Residential Connected Thermostats UES measure to December 31, 2020 |
Connected Thermostats |
November 19, 2019 |
Extend Sunset Date
Extend the sunset date for the following measures to January 31, 2020:
|
Air Source Heat Pump Upgrades and Conversions MH , Air Source Heat Pump Upgrades and Conversions SF , Commissioning, Controls, & Sizing MH , Commissioning, Controls, & Sizing SF |
November 19, 2019 |
Approved Measure Changes
Approve the updates to the Residential Manufactured Homes Weatherization Measure as presented and:
|
Manufactured Home Weatherization |
November 19, 2019 |
Allocate Resources to New Measure Development
Allocate resources to:
Do not allocate resource to:
|
Advanced Kitchen Ventilation Controls , Air Curtains for Walk-Ins , Display Case Upgrade and Replacement , ENERGY STAR Air Purifiers , Floating Controls for Multiplex Refrigeration System , Forced Circulation Generator Engine Block Heaters for Nonresidential Standby Generators , , High Efficiency Residential Central Air Conditioners , NanoX Technologies Cold-Plus Energy Efficient Technology , Non-Residential LED Wallpacks , Non-Residential Lighting Midstream , Retrofit or Upgrade Doors on Existing Display Cases , Small Commercial DHPs |
October 22, 2019 |
Approved Measure Changes
Adopt the updates to the Residential SF Weatherization Measures as presented and:
|
Single Family Weatherization |
October 22, 2019 |
Approved Measure Changes
Adopt the Refrigerator/Freezer Decommissioning and Recycling Measure as presented:
|
Refrigerator/Freezer Decommissioning |
October 22, 2019 |
Approved Measure Changes
Adopt the updates as presented to the DHPs for Zonal Heat SF and MH measure
and present to the RTF at a later date. |
Ductless Heat Pumps for Zonal Heat MH , Ductless Heat Pumps for Zonal Heat SF |
September 24, 2019 |
Approved Measure Changes
Approve the updates to the Residential Lighting UES measure as proposed with the application of the 45 lumen/watt standard for general purpose lamps in all states and for the expanded definition of GSLs (DOE Jan. 2017) for WA state, effective January 1, 2020.
|
Residential Lighting |
September 24, 2019 |
Extend Sunset Date
Extend the sunset date for the following measures to December 2019:
|
Anti-Sweat Heater Controls , Refrigerator/Freezer Decommissioning |
September 24, 2019 |
Approve Work/Business Plan and Charter Update
Adopt the proposed 2020 work plan and business plan, with recommendation to the Council for approval. Approve updates to the RTF Charter, as presented, with recommendation to the Council for approval. |
|
September 24, 2019 |
Approve SEEM Calibration Results
Approve the 'simplest-case' Phase I regression, as described in slide 58:
Approve Phase II of the calibration, as presented. |
|
August 27, 2019 |
Approve SEEM Calibration
Approve the single family phase II calibration as described above. |
|
August 27, 2019 |
Extend Sunset Date
Extend the sunset date for the Multifamily New Construction (ID and MT) UES to June 2020. |
Multifamily New Construction (ID and MT) |
August 27, 2019 |
Extend Sunset Date
Extend the sunset date for the Potato/Onion Shed Fan Variable Frequency Drive to August 2024 and:
|
Potato/Onion Shed Variable Frequency Drives |
July 23, 2019 |
Approve SEEM Calibration
Approve the single-family phase 1 calibration (v. 2.2) as presented, and direct staff to conduct a check on the electric calibration using consumption and other best available data and report back with findings. |
|
July 23, 2019 |
Approved Measure Changes
Approve the Floating Head Pressure Controls UES as presented
|
Floating Head Pressure Controls for Single Compressor Systems |
July 23, 2019 |
Approved Measure Changes
Approve the Strip Curtain UES as presented and change the sunset date to July 30, 2024. |
Strip Curtains |
June 18, 2019 |
Approve Demand Response Impact Estimate
Approve the recommended methodology for estimating maximum per unit potential of Residential Water Heaters as presented.
|
|
June 18, 2019 |
Approve Demand Response Impact Estimate
Approve the recommended methodology for estimating maximum technical per unit potential of Refrigerated Warehouses as presented.
|
|
June 18, 2019 |
Deactivate Measure
Deactivate the Door Gasket Replacement UES. |
Door Gasket Replacement |
June 18, 2019 |
Extend Sunset Dates
Extend the sunset date for the Floating Head Pressure Controls UES to September 2019
|
Air Source Heat Pump Upgrades and Conversions MH , Air Source Heat Pump Upgrades and Conversions SF , Commissioning, Controls, & Sizing MH , Commissioning, Controls, & Sizing SF , Ductless Heat Pumps for Zonal Heat MH , Ductless Heat Pumps for Zonal Heat SF , Floating Head Pressure Controls for Single Compressor Systems , , Single Family Weatherization |
May 21, 2019 |
Approve Demand Response Impact Estimate
Approve the recommended methodology for estimating maximum technical per unit potential of Irrigation Pumps as presented. In approving this, the RTF recognizes that additional factors will need to be considered to estimate achievable potential, including, but are not limited to:
|
|
May 21, 2019 |
Endorse White Paper Findings and Recommendations
The RTF endorses the findings and recommendations provided in the executive summary of the whole building white paper, and directs that the RTF staff engages in further activities as presented. |
|
May 21, 2019 |
Adopt New Measure
Adopt Residential Level 2 AC EV Chargers:
|
Level 2 Electric Vehicle Charger |
April 23, 2019 |
Deactivate Measure
Deactivate Slab Insulation UES. |
Slab Insulation |
April 23, 2019 |
Extend Sunset Date
Extend the sunset date for the Potato/Onion Shed VFD UES to August 2019. |
Potato/Onion Shed Variable Frequency Drives |
April 23, 2019 |
Approve Measure Updates
Adopt the updates to the Residential Electronic Thermostats measure as presented:
|
Residential Electronic Line Voltage Thermostats |
April 23, 2019 |
Approve Measure Updates
Approve the updates to the Compressor Head Fan Motor Retrofit ECM UES measure as presented and:
|
Compressor Head Fan Motor Retrofit to ECM |
April 23, 2019 |
Approve Measure Updates
Approve the updates to the Display Case Evaporator Fan Motor Retrofit to ECM UES measure as presented and:
|
Display Case Evaporator Fan Motor Retrofit |
March 19, 2019 |
Extend Sunset Dates
Extend the sunset date for the following measures as follows:
|
Compressor Head Fan Motor Retrofit to ECM , Display Case Evaporator Fan Motor Retrofit , Multi-Family Weatherization , School Weatherization |
March 19, 2019 |
Adopt Standard Information Workbook Updates
Adopt the updates to the Standard Information Workbook as presented with the following modifications:
|
All Measure Applicable |
February 20, 2019 |
Approve Measure Updates
Approve the updates as presented to the Residential and Low Flow Showerhead measure.
|
Commercial and Residential Showerheads |
February 20, 2019 |
Approve Measure Updates
Approve the updates as presented to the Commercial Low Flow Showerhead measure.
|
Commercial and Residential Showerheads |
February 20, 2019 |
Approve Measure Updates
Approve the updates as presented to the Thermostatic Shower Restrictor Valve measure:
|
Thermostatic Shower Restriction Valve |
February 20, 2019 |
Approve Demand Response Savings Estimate
Approve the per unit demand response savings estimates for Networked Residential Level 2 AC EV Chargers as presented. |
Level 2 Electric Vehicle Charger |
February 20, 2019 |
Approve Demand Response Savings Estimate
Approve the analysis of demand response savings (as a percentage of lighting load) and cost for Non-residential Lighting Controls as presented and including updated controls costs from NEEA. |
|
January 23, 2019 |
Extend Sunset Date
Extend the sunset date for the Ductless Heat Pumps for Zonal Heat Single Family and Manufactured Homes measures to June 2019, and set the measure status to Under Review. |
Ductless Heat Pumps for Zonal Heat MH , Ductless Heat Pumps for Zonal Heat SF |
January 23, 2019 |
Approve Measure Updates
Adopt the updates to the Refrigerator and Freezer UES as presented and:
|
Residential Refrigerators and Freezers |
January 23, 2019 |
Extend Sunset Date
Extend the sunset date for the following measures to July 2019:
|
Air Source Heat Pump Upgrades and Conversions MH , Commissioning, Controls, & Sizing MH , |
January 23, 2019 |
Approve Measure Updates
Approve the updates to the Nonresidential Lighting Retrofits Standard Protocol as presented and in the Additional Slides section.
|
Non-Residential Lighting Retrofits |
January 23, 2019 |
Approve Methodology Changes
Approve the methodology for mapping locations to available weather data and for selecting weather locations for building simulation in measure assessments. |
|
November 8, 2018 |
Extend Measure Sunset Dates
Extend the sunset date for the Residential Air Source Heat Pump Upgrades SF UES and Commissioning Controls and Sizing in SF UES to June 30, 2019. |
Air Source Heat Pump Upgrades and Conversions SF , Commissioning, Controls, & Sizing SF |
November 8, 2018 |
Adopt New Measure
Adopt the Commercial Glazing Systems UES measure as proposed:
|
Commercial Secondary Glazing Systems |
November 7, 2018 |
Approve Measure Updates
Approve the updates to the Residential Advanced Power Strips UES measure savings, costs, lifetime, and Research Strategy as presented and:
|
Residential Advanced Power Strips |
November 7, 2018 |
Approve Measure Updates
Approve the updates to the Commercial Advanced Power Strips UES measure savings, costs, lifetime, and Research Strategy as presented and:
|
Commercial Advanced Power Strips |
November 7, 2018 |
Approve Measure Updates
Approve the updates to the Non-Residential Lighting Midstream UES measures as presented
|
Non-Residential Lighting Midstream |
November 7, 2018 |
Approve Measure Updates
Approve the analysis updates for the Residential Lighting UES measure as presented:
For Pin-Base Lamps:
For Fixtures:
For all applications:
|
Residential Lighting |
November 7, 2018 |
Allocate Resources to New Measure Development
Allocate resources to developing the Level 2 Electric Vehicle Charger UES. |
Level 2 Electric Vehicle Charger |